Dark current studies EINJ/EACA

From MPS Wiki
Revision as of 01:01, 9 June 2021 by Malcorta (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

EINJ Dark current tests, July 26, 2019 E-log entry

Values of BLMs with respect to EINJ amplitude
EINJ amplitude (MV) ELBT:PMT1A reading ELBT:PMT1B reading ELBT:PMT1C reading ELBD:PMT0 reading
600 15 n/a 15 n/a
650 15 n/a 15 n/a
700 15 n/a 15 n/a
750 23 n/a 20 n/a
800 40 n/a 30 n/a
850 82 n/a 60 n/a
900 210 n/a 140 n/a

Low energy beam loss monitor positions.

EINJ Dark current tests, August 28, 2019 E-log entry

Low energy beam loss monitor positions.

Low energy beam loss monitor positions.