<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://mps.wiki.triumf.ca/w/index.php?action=history&amp;feed=atom&amp;title=MPS_Minutes_20210818</id>
	<title>MPS Minutes 20210818 - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://mps.wiki.triumf.ca/w/index.php?action=history&amp;feed=atom&amp;title=MPS_Minutes_20210818"/>
	<link rel="alternate" type="text/html" href="https://mps.wiki.triumf.ca/w/index.php?title=MPS_Minutes_20210818&amp;action=history"/>
	<updated>2026-05-07T01:03:16Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.39.4</generator>
	<entry>
		<id>https://mps.wiki.triumf.ca/w/index.php?title=MPS_Minutes_20210818&amp;diff=197&amp;oldid=prev</id>
		<title>Lennarz: Created page with &quot;Present: MA, HH, RN, AD, MR, KL, AL  ==Commissioning status== *Finished scans in medium energy section *Initial issues with EMBT:MB0 power supply stopped us from taking scan t...&quot;</title>
		<link rel="alternate" type="text/html" href="https://mps.wiki.triumf.ca/w/index.php?title=MPS_Minutes_20210818&amp;diff=197&amp;oldid=prev"/>
		<updated>2021-08-25T19:06:54Z</updated>

		<summary type="html">&lt;p&gt;Created page with &amp;quot;Present: MA, HH, RN, AD, MR, KL, AL  ==Commissioning status== *Finished scans in medium energy section *Initial issues with EMBT:MB0 power supply stopped us from taking scan t...&amp;quot;&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;Present: MA, HH, RN, AD, MR, KL, AL&lt;br /&gt;
&lt;br /&gt;
==Commissioning status==&lt;br /&gt;
*Finished scans in medium energy section&lt;br /&gt;
*Initial issues with EMBT:MB0 power supply stopped us from taking scan the week before&lt;br /&gt;
*Taking scans at EINJ setpoint 950 - 975 ~10.5 MeV&lt;br /&gt;
**Higher EINJ setting increased dark current by factor of ~3. Spill levels in medium section ~factor of 2-3 higher compared to 2020 data. In high energy section as well.&lt;br /&gt;
**Still need to take dark current scan to add background to thresholds&lt;br /&gt;
**Should also have a study of energy dependence and dark current&lt;br /&gt;
*10kW was reached at 25MeV (EINJ setting ~710). No issue with BLMs tripping&lt;br /&gt;
*Problem really mostly with tuning procedure when beam is on view screens&lt;br /&gt;
**Is there a way one could implement interlock procedure that disables a particular detector when specific view screen is inserted and re-enables when the view screen is out of the beamline again?&lt;br /&gt;
**Presently, we're tripping when on view screens as beam is spilled and trip settings are for well-focused beam.&lt;br /&gt;
**We shouldn't sacrifice safety for convenience and just bump up thresholds&lt;br /&gt;
**Rod: This requires well specified changes&lt;br /&gt;
**In principle single channel can be disabled. Just have viewscreen status as trigger.&lt;br /&gt;
**Rod: Option for more detectors to discriminate between de-focused and focused spills? Might be to complicated for immediate solution.&lt;br /&gt;
**Should we have threshold settings depending on mode of operation? Need to discuss with Thomas.&lt;br /&gt;
**MA: Does cyclotron have monitors that are getting disabled from time to time? --&amp;gt; Unclear.&lt;br /&gt;
&lt;br /&gt;
==E-LINAC status==&lt;br /&gt;
*10kW was reached at 25MeV (EINJ setting ~710).&lt;br /&gt;
*Next goal is 10kW at 30MeV.&lt;br /&gt;
*Fields were measured by RPG outside of the ehall and didn't appear to increase with higher power&lt;br /&gt;
*RPG measured fields at the dump afterwards. ~10uSvr/hr as usual.&lt;br /&gt;
*On Wednesday evening energy was already increased to 27.8 MeV at 6kW. Tune wasn't ideal. Spills just at threshold limits in high energy section. AL slightly increased levels from 50nC to ~75nC to avoid trips. In high energy section we have factor of 2 safety margin before hitting 100nC in 100ms losses.&lt;br /&gt;
 &lt;br /&gt;
&lt;br /&gt;
==AOB==&lt;br /&gt;
*AL reached out to Thomas about meeting for global reset. Will arrange meeting time when Thomas is back from vacation&lt;br /&gt;
*After MPS re-commissioning report, AL will write up LED calibration specs&lt;br /&gt;
*Still need to get Post-Mortem data to analyse from BLM trips. &lt;br /&gt;
*No update on fibre. Reflector has not arrived yet.&lt;br /&gt;
&lt;br /&gt;
==Action Items==&lt;br /&gt;
*AL to arrange meeting with Thomas&lt;br /&gt;
*AL to finish MPS re-commissioning report&lt;br /&gt;
*AL/MA to coordinate dark current scan with Thomas/Yanyun/Ops&lt;br /&gt;
*MA/AT/AL test fibre with reflector and beam. Test position sensitivity&lt;br /&gt;
*AL to write up LED calibration specs&lt;br /&gt;
*MA/AL write up specs for beam enable after commissioning results.&lt;/div&gt;</summary>
		<author><name>Lennarz</name></author>
	</entry>
</feed>