MPS Minutes 20210527: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
 (Created page with "Present: MA, RC, AD, HH, KL, RN, AL (recorder)  ==Second stage trip ==  ==HV BLM issue (iseg) ==  == E-hall work ==  == Fibre ==  == AOB ==")  | 
				 (→AOB)  | 
				||
| Line 10: | Line 10: | ||
== AOB ==  | == AOB ==  | ||
*HH replaced broken HV connector on roof for ELBT:PMT1C.  | |||
*AD to correct LED label in epics on driver from EHBT:PMT4 to EHAT:PMT4.  | |||
*MA: Wiki now accessible without vpn connection. Should be ok, as documents are only linked and not uploaded. To access those one still has to use vpn.  | |||
*AL still needs to write up doc for LED calibration. For LICs, we'll probably just use regular spills (in between targets for instance) to test LIC response in the future.  | |||
*MA, AL to do Post-Mortem tests.  | |||
*AD approved Martin's document in docushare.  | |||
Revision as of 22:43, 27 May 2021
Present: MA, RC, AD, HH, KL, RN, AL (recorder)
Second stage trip
HV BLM issue (iseg)
E-hall work
Fibre
AOB
- HH replaced broken HV connector on roof for ELBT:PMT1C.
 - AD to correct LED label in epics on driver from EHBT:PMT4 to EHAT:PMT4.
 - MA: Wiki now accessible without vpn connection. Should be ok, as documents are only linked and not uploaded. To access those one still has to use vpn.
 - AL still needs to write up doc for LED calibration. For LICs, we'll probably just use regular spills (in between targets for instance) to test LIC response in the future.
 - MA, AL to do Post-Mortem tests.
 - AD approved Martin's document in docushare.