MPS Minutes 20220120: Difference between revisions

From MPS Wiki
Jump to navigation Jump to search
(Created page with "==FLASH/Darklight effect on MPS== *Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and...")
 
No edit summary
Line 1: Line 1:
==BLM calibration==
*AL preparing documents for requirements and specs
==View screen / BLM interlocks for tuning==
*AL preparing documents for requirements and specs
==FLASH/Darklight effect on MPS==
==FLASH/Darklight effect on MPS==


*Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications
*Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications
*Recommissioning required for medium and high energy section.
==2nd stage trip implementation==
*Final status of implementation?
*What is left to do/needed?
==Fibre==
*Do we have PMT?
*What SiPMs are we looking to buy?
==AOB==

Revision as of 17:43, 20 January 2022

BLM calibration

  • AL preparing documents for requirements and specs

View screen / BLM interlocks for tuning

  • AL preparing documents for requirements and specs

FLASH/Darklight effect on MPS

  • Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications
  • Recommissioning required for medium and high energy section.

2nd stage trip implementation

  • Final status of implementation?
  • What is left to do/needed?

Fibre

  • Do we have PMT?
  • What SiPMs are we looking to buy?

AOB