MPS Minutes 20220120: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 4: | Line 4: | ||
==View screen / BLM interlocks for tuning== | ==View screen / BLM interlocks for tuning== | ||
*AL preparing documents for requirements and specs | *AL preparing documents for requirements and specs | ||
*Is table and requirements enough? Or what should document look like? | |||
==FLASH/Darklight effect on MPS== | ==FLASH/Darklight effect on MPS== |
Revision as of 17:44, 20 January 2022
BLM calibration
- AL preparing documents for requirements and specs
View screen / BLM interlocks for tuning
- AL preparing documents for requirements and specs
- Is table and requirements enough? Or what should document look like?
FLASH/Darklight effect on MPS
- Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications
- Recommissioning required for medium and high energy section.
2nd stage trip implementation
- Final status of implementation?
- What is left to do/needed?
Fibre
- Do we have PMT?
- What SiPMs are we looking to buy?