MPS Minutes 20220120: Difference between revisions
Jump to navigation
Jump to search
Line 11: | Line 11: | ||
==FLASH/Darklight effect on MPS== | ==FLASH/Darklight effect on MPS== | ||
*Darklight and FLASH installation complete | |||
*Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications | *Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications | ||
*Recommissioning required for medium and high energy section. | *Recommissioning required for medium and high energy section. | ||
*1kW for FLASH dump in pulse mode. 1W in continuous mode. There might be extra room for BLM thresholds ==> AL to follow up with Luca E. | |||
*original dump design was for 500W ? | |||
==2nd stage trip implementation== | ==2nd stage trip implementation== |
Revision as of 00:23, 21 January 2022
BLM calibration
- AL preparing documents for requirements and specs
- Needs to be done at reasonable background levels, i.e., not with high dark current conditions from cavities.
- Should this go hand in hand with scan to verify coverage after a long shut down period?
- Add flow chart
View screen / BLM interlocks for tuning
- AL preparing documents for requirements and specs
- Is table and requirements enough? Or what should document look like?
FLASH/Darklight effect on MPS
- Darklight and FLASH installation complete
- Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications
- Recommissioning required for medium and high energy section.
- 1kW for FLASH dump in pulse mode. 1W in continuous mode. There might be extra room for BLM thresholds ==> AL to follow up with Luca E.
- original dump design was for 500W ?
2nd stage trip implementation
- Final status of implementation?
- What is left to do/needed?
Fibre
- Do we have PMT?
- What SiPMs are we looking to buy?
AOB
- Do all channels already have an HV OK? Do some still need to be added to watchdog?
- Making LICs for BL4N once cases are down a bit