MPS Minutes 20220120: Difference between revisions
Jump to navigation
Jump to search
(Created page with "==FLASH/Darklight effect on MPS== *Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and...") |
|||
(12 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Meeting commenced: 10:00am | |||
Meeting adjourned: 10:36am | |||
Present: HH, MA, KL, RN, MR, RC, AD, AL | |||
==E-Linac status== | |||
*Unclear when beam will be back. | |||
*What are priorities once beam is back? FLASH station? | |||
*Hoping for more information in Friday meeting | |||
==BLM calibration== | |||
*AL preparing documents for requirements and specs | |||
*Needs to be done at reasonable background levels, i.e., not with high dark current conditions from cavities. | |||
*Should this go hand in hand with scan to verify coverage after a long shut down period? | |||
*Add flow chart for sequence of events | |||
*AL to implement comments for BLM calibration requirements/specs document and send out to reviewers | |||
*Add requirements: For instance, beam needs to be off for calibration, cavities off => procedure during downtime | |||
*Add Rod, Alex and Brandon as reviewer, Mike for final approval | |||
*Make sure to define times precisely | |||
*Use 2 calibration points for PMTs to verify linearity | |||
==View screen / BLM interlocks for tuning== | |||
*AL preparing documents for requirements and specs | |||
*Add requirements and table | |||
*6-7 VS with 1 or 2 BLMs to be prevented from tripping | |||
*Be clear on definition of "disabled". Trip function should be disabled, but readback must be available. | |||
==FLASH/Darklight effect on MPS== | ==FLASH/Darklight effect on MPS== | ||
*Darklight and FLASH installation complete | |||
*Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications | *Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications | ||
*Recommissioning required for medium and high energy section. | |||
*Power limits for FLASH dump? 1kW for FLASH dump in pulse mode? 200W in continuous mode. There might be extra room for BLM thresholds ==> AL to follow up with Luca E. | |||
*original dump design was for 500W ? | |||
==Fibre== | |||
*MA in contact with Hamamatsu on lead times for PMTs. Seem to be around 2-3 months. | |||
*2 PMTs may be available from Conny | |||
*Thomas Lindner took his PMT back end of 2021 | |||
*Thomas L. had factory/of-the-shelve fibre coupler. We may need 3D printed coupler and just buy connector. HH thinks this is possbile. Have 3D printer with black plastic available for use. | |||
*MA will try to get drawings from manufacturer | |||
==AOB== | |||
*Making LICs for BL4N once cases are down a bit | |||
*HH offers to be around when Phil L. shows AL and MA how to manufacturer LICs. Possible option to make the LICs in electronics shop. | |||
*MA to check with Phil L. if all parts are available. | |||
*Do we have enough for full length of tunnel? | |||
*Might make longer LICs depending on required position resolution | |||
*Tricky part might be the end caps to seal Argon connections. | |||
==Action Items== | |||
*AL to follow up with Luca E. on power levels for FLASH dump. | |||
*AL to send out document for view screen/BLM interlock requirements/specs | |||
*AL to implement comments for BLM calibration requirements/specs document and send out to reviewers | |||
*MA: What SiPMs and or PMTs are we looking to buy? | |||
*Fibre coupler: MA will try to get drawings from manufacturer for 3D printing option | |||
*MA to check with Phil L. if all parts are available for BL4N LICs. | |||
*2nd stage trip implementation: | |||
**Final status of implementation? | |||
**What is left to do/needed? | |||
*AL to take recommissioning scans in medium and high energy section, once beam is back. |
Latest revision as of 00:42, 21 January 2022
Meeting commenced: 10:00am Meeting adjourned: 10:36am Present: HH, MA, KL, RN, MR, RC, AD, AL
E-Linac status
- Unclear when beam will be back.
- What are priorities once beam is back? FLASH station?
- Hoping for more information in Friday meeting
BLM calibration
- AL preparing documents for requirements and specs
- Needs to be done at reasonable background levels, i.e., not with high dark current conditions from cavities.
- Should this go hand in hand with scan to verify coverage after a long shut down period?
- Add flow chart for sequence of events
- AL to implement comments for BLM calibration requirements/specs document and send out to reviewers
- Add requirements: For instance, beam needs to be off for calibration, cavities off => procedure during downtime
- Add Rod, Alex and Brandon as reviewer, Mike for final approval
- Make sure to define times precisely
- Use 2 calibration points for PMTs to verify linearity
View screen / BLM interlocks for tuning
- AL preparing documents for requirements and specs
- Add requirements and table
- 6-7 VS with 1 or 2 BLMs to be prevented from tripping
- Be clear on definition of "disabled". Trip function should be disabled, but readback must be available.
FLASH/Darklight effect on MPS
- Darklight and FLASH installation complete
- Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications
- Recommissioning required for medium and high energy section.
- Power limits for FLASH dump? 1kW for FLASH dump in pulse mode? 200W in continuous mode. There might be extra room for BLM thresholds ==> AL to follow up with Luca E.
- original dump design was for 500W ?
Fibre
- MA in contact with Hamamatsu on lead times for PMTs. Seem to be around 2-3 months.
- 2 PMTs may be available from Conny
- Thomas Lindner took his PMT back end of 2021
- Thomas L. had factory/of-the-shelve fibre coupler. We may need 3D printed coupler and just buy connector. HH thinks this is possbile. Have 3D printer with black plastic available for use.
- MA will try to get drawings from manufacturer
AOB
- Making LICs for BL4N once cases are down a bit
- HH offers to be around when Phil L. shows AL and MA how to manufacturer LICs. Possible option to make the LICs in electronics shop.
- MA to check with Phil L. if all parts are available.
- Do we have enough for full length of tunnel?
- Might make longer LICs depending on required position resolution
- Tricky part might be the end caps to seal Argon connections.
Action Items
- AL to follow up with Luca E. on power levels for FLASH dump.
- AL to send out document for view screen/BLM interlock requirements/specs
- AL to implement comments for BLM calibration requirements/specs document and send out to reviewers
- MA: What SiPMs and or PMTs are we looking to buy?
- Fibre coupler: MA will try to get drawings from manufacturer for 3D printing option
- MA to check with Phil L. if all parts are available for BL4N LICs.
- 2nd stage trip implementation:
- Final status of implementation?
- What is left to do/needed?
- AL to take recommissioning scans in medium and high energy section, once beam is back.