(Created page with "Present: BH, MA, RC, SR, MR, HH, RN, AL Commenced: 10:01am Adjourned: 10:30am ==BLM force functionality== *Roll-out done by Mike this week. *First test performed with Brandon. Forced one detector, and it was still possible to send beam *") |
No edit summary |
||
Line 6: | Line 6: | ||
*Roll-out done by Mike this week. | *Roll-out done by Mike this week. | ||
*First test performed with Brandon. Forced one detector, and it was still possible to send beam | *First test performed with Brandon. Forced one detector, and it was still possible to send beam | ||
* | *First tests successful | ||
*AL verified threshold and voltage settings are correct after roll-out | |||
*For EMBD:LIC2 (on the detector page), the slider for HV is at zero, while the voltage seems on and the readback is at 500V. MR to look into this. | |||
*Next step: Testing. AL to write up testing/commissioning procedure. This has priority. | |||
==E-linac Status== | |||
*Obtaining license will still take at least 6 weeks. | |||
==BLM position== | |||
*AL messaged Darren Blom to get remaining BLMs fixed in place | |||
*Will pick a day when hall is open next week | |||
*Darren suggested 3D printed option for mount of one of the low-energy detectors that was moved during work last year | |||
*Even though darklight will be installed in high energy dump section, LICs should be fixed in place for now. | |||
*Recommissioning will be required whenever changes to beamline are made | |||
==Post Mortem== | |||
*AL to do tests with RC next week to check functionality and readout | |||
*Use LEDs and external trip for offline testing | |||
==Fibre== | |||
*No update | |||
==BLM calibration== | |||
*BLM calibration functionality will be implemented once BLM force functionality has been tested | |||
*AL to finish document first | |||
==AOB== | |||
*ELBD:PMT0 detector should no longer cause a trip of the FSD, as it's not positioned along beamline anymore, but in front of egun window for monitoring | |||
*MR to remove this detector from trip logic and detector ok check. Will require work permit and update of documentation |
Latest revision as of 19:13, 2 March 2023
Present: BH, MA, RC, SR, MR, HH, RN, AL Commenced: 10:01am Adjourned: 10:30am
BLM force functionality
- Roll-out done by Mike this week.
- First test performed with Brandon. Forced one detector, and it was still possible to send beam
- First tests successful
- AL verified threshold and voltage settings are correct after roll-out
- For EMBD:LIC2 (on the detector page), the slider for HV is at zero, while the voltage seems on and the readback is at 500V. MR to look into this.
- Next step: Testing. AL to write up testing/commissioning procedure. This has priority.
E-linac Status
- Obtaining license will still take at least 6 weeks.
BLM position
- AL messaged Darren Blom to get remaining BLMs fixed in place
- Will pick a day when hall is open next week
- Darren suggested 3D printed option for mount of one of the low-energy detectors that was moved during work last year
- Even though darklight will be installed in high energy dump section, LICs should be fixed in place for now.
- Recommissioning will be required whenever changes to beamline are made
Post Mortem
- AL to do tests with RC next week to check functionality and readout
- Use LEDs and external trip for offline testing
Fibre
- No update
BLM calibration
- BLM calibration functionality will be implemented once BLM force functionality has been tested
- AL to finish document first
AOB
- ELBD:PMT0 detector should no longer cause a trip of the FSD, as it's not positioned along beamline anymore, but in front of egun window for monitoring
- MR to remove this detector from trip logic and detector ok check. Will require work permit and update of documentation