MPS Minutes 20240208: Difference between revisions
 (Created page with "MPS meeting minutes – Feb. 8th, 2024 – 10am online Present: AL (chair, recorder), SR, BH, MA, KL, BH, HH, TP, RC, MR Commenced: 10:00 am Adjourned: 10:35 am  1)	Status *E-hall is open today. *Emergency opening on Monday. Turbine issues. *Warm oil tank. *One of the insulators cracked. Keep running, but need to monitor tank. *Following up on reason for EGUN:BIAS trip due to a stage 2 trip from EABT:LIC3B. This was due to losses from EACA. Caused a dozen trips towards e...")  | 
				No edit summary  | 
				||
| Line 4: | Line 4: | ||
Adjourned: 10:35 am  | Adjourned: 10:35 am  | ||
1)	Status  | ==1)	Status ==  | ||
*E-hall is open today.  | *E-hall is open today.  | ||
*Emergency opening on Monday. Turbine issues.  | *Emergency opening on Monday. Turbine issues.  | ||
| Line 28: | Line 28: | ||
•	6-8 weeks shut down. Doug needs to install collimator behind the dogleg. Takes until April  | •	6-8 weeks shut down. Doug needs to install collimator behind the dogleg. Takes until April  | ||
•	  | •	  | ||
2)	Interlock functionality testing  | == 2)	Interlock functionality testing ==  | ||
•	Any time for this?  | •	Any time for this?  | ||
•	3 BLM force functions have been completed  | •	3 BLM force functions have been completed  | ||
| Line 34: | Line 34: | ||
•	Mike fixed that one LED wasn’t lighting up.  | •	Mike fixed that one LED wasn’t lighting up.  | ||
•	Still inconsistencies in messaging, but otherwise functioning nicely  | •	Still inconsistencies in messaging, but otherwise functioning nicely  | ||
3)	Simulations  | |||
== 3)	Simulations ==  | |||
*Progress from Alexey  | |||
*Need to benchmark simulations with what we see in the e-hall.  | |||
*Could use old scans/spills  | |||
*If required, do this before the BL4N collimator shut-down  | |||
4)	Fibre  | |||
== 4)	Fibre ==  | |||
* No update.  | |||
5)	AOB  | |||
== 5)	AOB ==  | |||
*Ricky is working on license enforcement system related to EOCEM replacement. Started looking at logic and planning to do the testing during the shutdown.  | |||
*Calibration document  | |||
*Planning for BL4N. We have 5 FSD modules. Need 2 for the other side of the tunnel  | |||
*BLM modules (3 are in use)  | |||
*Run fibre from 1 FSD to the other FSD  | |||
== 6) Action Items ==  | |||
*AL to submit calibration document.  | |||
*SR to send specs for collimator. Needed for integration into FSD shutdown.  | |||
Revision as of 18:20, 9 February 2024
MPS meeting minutes – Feb. 8th, 2024 – 10am online Present: AL (chair, recorder), SR, BH, MA, KL, BH, HH, TP, RC, MR Commenced: 10:00 am Adjourned: 10:35 am
1) Status
- E-hall is open today.
 - Emergency opening on Monday. Turbine issues.
 - Warm oil tank.
 - One of the insulators cracked. Keep running, but need to monitor tank.
 - Following up on reason for EGUN:BIAS trip due to a stage 2 trip from EABT:LIC3B. This was due to losses from EACA. Caused a dozen trips towards end of the test. But detector worked as it was supposed to.
 - Observed spikes in charge reading of EABD:PMT0. Irregular. Noise pick up? Not dramatic, but noticeable regular spikes. May hint at developing problem.
 - Before end of 2023 year, there was an issue with EMBD:LIC2 (Sudden trips). Did problem come back during the last months? Brandon and AL checked connections, couldn’t find any visible problem. ==> No re-occurrence since last year.
 
• How long will shut down be? • When is Darklight going in/out? • Expect differences with coverage when Darklight goes in • EHD line after EHDT:MB4 to the dump will be completely changed. One mode with darklight target out and one mode with darklight target in. • Darklight will need 10kW. Will it be heavily shielded? • Collimator will be installed in front of the dump. • BPMs are getting moved. Not used in the same way. • Who shuts down beam when collimator sees to much • Need similar channel. Target this in the upcoming shutdown. Modification to the daughter board. Solder 2 capacitors. And • Document to share the specs. An order of magnitude of power. Need specs from Stephanie. No CW, just pulsed. • Verify connections before shielding goes back. • Commissioning for beamloss monitors done • Run to EMBD. HV pick-up. Expect to be contacted. Number for LIC defeat in FLASH report. • 6-8 weeks shut down. Doug needs to install collimator behind the dogleg. Takes until April •
2) Interlock functionality testing
• Any time for this? • 3 BLM force functions have been completed • Do the rest during shut-down. • Mike fixed that one LED wasn’t lighting up. • Still inconsistencies in messaging, but otherwise functioning nicely
3) Simulations
- Progress from Alexey
 - Need to benchmark simulations with what we see in the e-hall.
 - Could use old scans/spills
 - If required, do this before the BL4N collimator shut-down
 
4) Fibre
- No update.
 
5) AOB
- Ricky is working on license enforcement system related to EOCEM replacement. Started looking at logic and planning to do the testing during the shutdown.
 
- Calibration document
 - Planning for BL4N. We have 5 FSD modules. Need 2 for the other side of the tunnel
 - BLM modules (3 are in use)
 - Run fibre from 1 FSD to the other FSD
 
6) Action Items
- AL to submit calibration document.
 - SR to send specs for collimator. Needed for integration into FSD shutdown.