MPS Minutes 20240208: Difference between revisions

From MPS Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 12: Line 12:
*Observed spikes in charge reading of EABD:PMT0. Irregular. Noise pick up? Not dramatic, but noticeable regular spikes. May hint at developing problem.
*Observed spikes in charge reading of EABD:PMT0. Irregular. Noise pick up? Not dramatic, but noticeable regular spikes. May hint at developing problem.
*Before end of 2023 year, there was an issue with EMBD:LIC2 (Sudden trips). Did problem come back during the last months? Brandon and AL checked connections, couldn’t find any visible problem. ==> No re-occurrence since last year.  
*Before end of 2023 year, there was an issue with EMBD:LIC2 (Sudden trips). Did problem come back during the last months? Brandon and AL checked connections, couldn’t find any visible problem. ==> No re-occurrence since last year.  
*
*How long will shut down be?
• How long will shut down be?
*When is Darklight going in/out?  
• When is Darklight going in/out?  
*Expect differences with coverage when Darklight goes in
• Expect differences with coverage when Darklight goes in
*EHD line after EHDT:MB4 to the dump will be completely changed. One mode with darklight target out and one mode with darklight target in.
• EHD line after EHDT:MB4 to the dump will be completely changed. One mode with darklight target out and one mode with darklight target in.
*Darklight will need 10kW. Will it be heavily shielded?
• Darklight will need 10kW. Will it be heavily shielded?
*Collimator will be installed in front of the dump.
• Collimator will be installed in front of the dump.
*BPMs are getting moved. Not used in the same way.
• BPMs are getting moved. Not used in the same way.
*Who shuts down beam when collimator sees to much
• Who shuts down beam when collimator sees to much
*Need similar channel. Target this in the upcoming shutdown. Modification to the daughter board. Solder 2 capacitors. And  
• Need similar channel. Target this in the upcoming shutdown. Modification to the daughter board. Solder 2 capacitors. And  
*Document to share the specs. An order of magnitude of power. Need specs from Stephanie. No CW, just pulsed.
• Document to share the specs. An order of magnitude of power. Need specs from Stephanie. No CW, just pulsed.
*Verify connections before shielding goes back.
• Verify connections before shielding goes back.
*Commissioning for beamloss monitors done
• Commissioning for beamloss monitors done
*Run to EMBD. HV pick-up. Expect to be contacted. Number for LIC defeat in FLASH report.
• Run to EMBD. HV pick-up. Expect to be contacted. Number for LIC defeat in FLASH report.
*6-8 weeks shut down. Doug needs to install collimator behind the dogleg. Takes until April
• 6-8 weeks shut down. Doug needs to install collimator behind the dogleg. Takes until April
•
== 2) Interlock functionality testing ==
== 2) Interlock functionality testing ==
• Any time for this?
*Any time for this?
• 3 BLM force functions have been completed
*3 BLM force functions have been completed
• Do the rest during shut-down.
*Do the rest during shut-down.
• Mike fixed that one LED wasn’t lighting up.
*Mike fixed that one LED wasn’t lighting up.
• Still inconsistencies in messaging, but otherwise functioning nicely
*Still inconsistencies in messaging, but otherwise functioning nicely


== 3) Simulations ==
== 3) Simulations ==

Latest revision as of 14:45, 14 March 2024

MPS meeting minutes – Feb. 8th, 2024 – 10am online Present: AL (chair, recorder), SR, BH, MA, KL, BH, HH, TP, RC, MR Commenced: 10:00 am Adjourned: 10:35 am

1) Status

  • E-hall is open today.
  • Emergency opening on Monday. Turbine issues.
  • Warm oil tank.
  • One of the insulators cracked. Keep running, but need to monitor tank.
  • Following up on reason for EGUN:BIAS trip due to a stage 2 trip from EABT:LIC3B. This was due to losses from EACA. Caused a dozen trips towards end of the test. But detector worked as it was supposed to.
  • Observed spikes in charge reading of EABD:PMT0. Irregular. Noise pick up? Not dramatic, but noticeable regular spikes. May hint at developing problem.
  • Before end of 2023 year, there was an issue with EMBD:LIC2 (Sudden trips). Did problem come back during the last months? Brandon and AL checked connections, couldn’t find any visible problem. ==> No re-occurrence since last year.
  • How long will shut down be?
  • When is Darklight going in/out?
  • Expect differences with coverage when Darklight goes in
  • EHD line after EHDT:MB4 to the dump will be completely changed. One mode with darklight target out and one mode with darklight target in.
  • Darklight will need 10kW. Will it be heavily shielded?
  • Collimator will be installed in front of the dump.
  • BPMs are getting moved. Not used in the same way.
  • Who shuts down beam when collimator sees to much
  • Need similar channel. Target this in the upcoming shutdown. Modification to the daughter board. Solder 2 capacitors. And
  • Document to share the specs. An order of magnitude of power. Need specs from Stephanie. No CW, just pulsed.
  • Verify connections before shielding goes back.
  • Commissioning for beamloss monitors done
  • Run to EMBD. HV pick-up. Expect to be contacted. Number for LIC defeat in FLASH report.
  • 6-8 weeks shut down. Doug needs to install collimator behind the dogleg. Takes until April

2) Interlock functionality testing

  • Any time for this?
  • 3 BLM force functions have been completed
  • Do the rest during shut-down.
  • Mike fixed that one LED wasn’t lighting up.
  • Still inconsistencies in messaging, but otherwise functioning nicely

3) Simulations

  • Progress from Alexey
  • Need to benchmark simulations with what we see in the e-hall.
  • Could use old scans/spills
  • If required, do this before the BL4N collimator shut-down

4) Fibre

  • No update.

5) AOB

  • Ricky is working on license enforcement system related to EOCEM replacement. Started looking at logic and planning to do the testing during the shutdown.
  • Calibration document
  • Planning for BL4N. We have 5 FSD modules. Need 2 for the other side of the tunnel
  • BLM modules (3 are in use)
  • Run fibre from 1 FSD to the other FSD

6) Action Items

  • AL to submit calibration document.
  • SR to send specs for collimator. Needed for integration into FSD shutdown.