*Observed spikes in charge reading of EABD:PMT0. Irregular. Noise pick up? Not dramatic, but noticeable regular spikes. May hint at developing problem.  | *Observed spikes in charge reading of EABD:PMT0. Irregular. Noise pick up? Not dramatic, but noticeable regular spikes. May hint at developing problem.  | ||
*Before end of 2023 year, there was an issue with EMBD:LIC2 (Sudden trips). Did problem come back during the last months? Brandon and AL checked connections, couldn’t find any visible problem. ==> No re-occurrence since last year.    | *Before end of 2023 year, there was an issue with EMBD:LIC2 (Sudden trips). Did problem come back during the last months? Brandon and AL checked connections, couldn’t find any visible problem. ==> No re-occurrence since last year.    | ||
*  | *How long will shut down be?  | ||
*When is Darklight going in/out?    | |||
*Expect differences with coverage when Darklight goes in  | |||
*EHD line after EHDT:MB4 to the dump will be completely changed. One mode with darklight target out and one mode with darklight target in.  | |||
*Darklight will need 10kW. Will it be heavily shielded?  | |||
*Collimator will be installed in front of the dump.  | |||
*BPMs are getting moved. Not used in the same way.  | |||
*Who shuts down beam when collimator sees to much  | |||
*Need similar channel. Target this in the upcoming shutdown. Modification to the daughter board. Solder 2 capacitors. And    | |||
*Document to share the specs. An order of magnitude of power. Need specs from Stephanie. No CW, just pulsed.  | |||
*Verify connections before shielding goes back.  | |||
*Commissioning for beamloss monitors done  | |||
*Run to EMBD. HV pick-up. Expect to be contacted. Number for LIC defeat in FLASH report.  | |||
*6-8 weeks shut down. Doug needs to install collimator behind the dogleg. Takes until April  | |||
== 2)	Interlock functionality testing ==  | == 2)	Interlock functionality testing ==  | ||
*Any time for this?  | |||
*3 BLM force functions have been completed  | |||
*Do the rest during shut-down.  | |||
*Mike fixed that one LED wasn’t lighting up.  | |||
*Still inconsistencies in messaging, but otherwise functioning nicely  | |||
== 3)	Simulations ==  | == 3)	Simulations ==  | ||
Latest revision as of 14:45, 14 March 2024
MPS meeting minutes – Feb. 8th, 2024 – 10am online Present: AL (chair, recorder), SR, BH, MA, KL, BH, HH, TP, RC, MR Commenced: 10:00 am Adjourned: 10:35 am
1) Status
- E-hall is open today.
 - Emergency opening on Monday. Turbine issues.
 - Warm oil tank.
 - One of the insulators cracked. Keep running, but need to monitor tank.
 - Following up on reason for EGUN:BIAS trip due to a stage 2 trip from EABT:LIC3B. This was due to losses from EACA. Caused a dozen trips towards end of the test. But detector worked as it was supposed to.
 - Observed spikes in charge reading of EABD:PMT0. Irregular. Noise pick up? Not dramatic, but noticeable regular spikes. May hint at developing problem.
 - Before end of 2023 year, there was an issue with EMBD:LIC2 (Sudden trips). Did problem come back during the last months? Brandon and AL checked connections, couldn’t find any visible problem. ==> No re-occurrence since last year.
 - How long will shut down be?
 - When is Darklight going in/out?
 - Expect differences with coverage when Darklight goes in
 - EHD line after EHDT:MB4 to the dump will be completely changed. One mode with darklight target out and one mode with darklight target in.
 - Darklight will need 10kW. Will it be heavily shielded?
 - Collimator will be installed in front of the dump.
 - BPMs are getting moved. Not used in the same way.
 - Who shuts down beam when collimator sees to much
 - Need similar channel. Target this in the upcoming shutdown. Modification to the daughter board. Solder 2 capacitors. And
 - Document to share the specs. An order of magnitude of power. Need specs from Stephanie. No CW, just pulsed.
 - Verify connections before shielding goes back.
 - Commissioning for beamloss monitors done
 - Run to EMBD. HV pick-up. Expect to be contacted. Number for LIC defeat in FLASH report.
 - 6-8 weeks shut down. Doug needs to install collimator behind the dogleg. Takes until April
 
2) Interlock functionality testing
- Any time for this?
 - 3 BLM force functions have been completed
 - Do the rest during shut-down.
 - Mike fixed that one LED wasn’t lighting up.
 - Still inconsistencies in messaging, but otherwise functioning nicely
 
3) Simulations
- Progress from Alexey
 - Need to benchmark simulations with what we see in the e-hall.
 - Could use old scans/spills
 - If required, do this before the BL4N collimator shut-down
 
4) Fibre
- No update.
 
5) AOB
- Ricky is working on license enforcement system related to EOCEM replacement. Started looking at logic and planning to do the testing during the shutdown.
 
- Calibration document
 - Planning for BL4N. We have 5 FSD modules. Need 2 for the other side of the tunnel
 - BLM modules (3 are in use)
 - Run fibre from 1 FSD to the other FSD
 
6) Action Items
- AL to submit calibration document.
 - SR to send specs for collimator. Needed for integration into FSD shutdown.