MPS Minutes 20240411: Difference between revisions

From MPS Wiki
Jump to navigation Jump to search
No edit summary
Line 8: Line 8:


==BLM force tests==
==BLM force tests==
*Straight forward so far
*Prevention of second force
*if applying second force, instead of rejecting it, it removes force from first detector and forces the other
*EHAT:LIC1 (has 2 sets of redundancies)
*EHAT:LIC2 ()
*Done half of the BLMs without beam
*And then do the beam tests
*ELBT wouldn't include any force parts
*April 22nd was the plan for beam back, but need to get egun oil
*April 22nd shielding should be replaced that day
*Collimator in the making (in one of the machine shops)
*Designed by sci-tec
*No installation before summer
*Need specs from Stephanie
*


==Collimator in front of dump==
==Collimator in front of dump==

Revision as of 17:10, 11 April 2024

Present: Commenced: 10:00am Adjourned:

MPS Status

  • Argon only turned on during force tests
  • Detectors in working order

BLM force tests

  • Straight forward so far
  • Prevention of second force
  • if applying second force, instead of rejecting it, it removes force from first detector and forces the other
  • EHAT:LIC1 (has 2 sets of redundancies)
  • EHAT:LIC2 ()
  • Done half of the BLMs without beam
  • And then do the beam tests
  • ELBT wouldn't include any force parts
  • April 22nd was the plan for beam back, but need to get egun oil
  • April 22nd shielding should be replaced that day
  • Collimator in the making (in one of the machine shops)
  • Designed by sci-tec
  • No installation before summer
  • Need specs from Stephanie

Collimator in front of dump

  • Has been installed by Doug
  • Next steps?
  • Do we have specs, to check if it can be implemented into our MPS system? ==> Stephanie

Fibre/Simulations

  • Any updates?

AOB