MPS Minutes 20240411: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 32: | Line 32: | ||
==Fibre/Simulations==  | ==Fibre/Simulations==  | ||
*  | *No updates from Alexey  | ||
==AOB==  | ==AOB==  | ||
Revision as of 17:12, 11 April 2024
Present: Commenced: 10:00am Adjourned:
MPS Status
- Argon only turned on during force tests
 - Detectors in working order
 
BLM force tests
- Straight forward so far
 - Prevention of second force
 - if applying second force, instead of rejecting it, it removes force from first detector and forces the other
 - EHAT:LIC1 (has 2 sets of redundancies)
 - EHAT:LIC2 ()
 - Done half of the BLMs without beam
 - And then do the beam tests
 - ELBT wouldn't include any force parts
 - April 22nd was the plan for beam back, but need to get egun oil
 - April 22nd shielding should be replaced that day
 
- Collimator in the making (in one of the machine shops)
 - Designed by sci-tec
 - No installation before summer
 - Need specs from Stephanie
 - Need work request for the install, so likely needed since multiple groups will be involved
 
Collimator in front of dump
- Has been installed by Doug
 - Next steps?
 - Do we have specs, to check if it can be implemented into our MPS system? ==> Stephanie
 
Fibre/Simulations
- No updates from Alexey