(Created page with "==MPS Status== *Argon only turned on during force tests *Detectors in working order ==BLM force tests== ==Collimator in front of dump== *Has been installed by Doug *Next steps? *Do we have specs, to check if it can be implemented into our MPS system? ==> Stephanie ==Fibre/Simulations== *Any updates? ==AOB==") |
(→AOB) |
||
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Present: | |||
Commenced: 10:00am | |||
Adjourned: | |||
==MPS Status== | ==MPS Status== | ||
*Argon only turned on during force tests | *Argon only turned on during force tests | ||
Line 4: | Line 8: | ||
==BLM force tests== | ==BLM force tests== | ||
*Straight forward so far | |||
*Prevention of second force | |||
*if applying second force, instead of rejecting it, it removes force from first detector and forces the other | |||
*EHAT:LIC1 (has 2 sets of redundancies) | |||
*EHAT:LIC2 () | |||
*Done half of the BLMs without beam | |||
*And then do the beam tests | |||
*ELBT wouldn't include any force parts | |||
*April 22nd was the plan for beam back, but need to get egun oil | |||
*April 22nd shielding should be replaced that day | |||
*Collimator in the making (in one of the machine shops) | |||
*Designed by sci-tec | |||
*No installation before summer | |||
*Need specs from Stephanie | |||
*Need work request for the install, so likely needed since multiple groups will be involved | |||
* | |||
==Collimator in front of dump== | ==Collimator in front of dump== | ||
Line 11: | Line 32: | ||
==Fibre/Simulations== | ==Fibre/Simulations== | ||
* | *No updates from Alexey | ||
*Has working simulation and now just doing checking of various positioning of detectors | |||
*Put LICs along the beamline in simulation, will determine on how many we need | |||
*Timeline for when the beamlines will be in place? | |||
*Will beamlines be installed both at the same time? Probably? | |||
*Need to have large benders from BL4N installed first | |||
* | |||
==AOB== | ==AOB== | ||
*Darklight got RTI around 400k | |||
*And already have an NSERC | |||
*Build a ring in the ehall to boost the energy | |||
*On top of being committed to realize terraherzt | |||
*And need protection system for the ring as well (for free! ;)) | |||
*Some old PhD thesis for design draft available and from ERL (Berlin) | |||
*Fibre for the ring? As MPS option. Cherenkov based. |
Latest revision as of 17:27, 11 April 2024
Present: Commenced: 10:00am Adjourned:
MPS Status
- Argon only turned on during force tests
- Detectors in working order
BLM force tests
- Straight forward so far
- Prevention of second force
- if applying second force, instead of rejecting it, it removes force from first detector and forces the other
- EHAT:LIC1 (has 2 sets of redundancies)
- EHAT:LIC2 ()
- Done half of the BLMs without beam
- And then do the beam tests
- ELBT wouldn't include any force parts
- April 22nd was the plan for beam back, but need to get egun oil
- April 22nd shielding should be replaced that day
- Collimator in the making (in one of the machine shops)
- Designed by sci-tec
- No installation before summer
- Need specs from Stephanie
- Need work request for the install, so likely needed since multiple groups will be involved
Collimator in front of dump
- Has been installed by Doug
- Next steps?
- Do we have specs, to check if it can be implemented into our MPS system? ==> Stephanie
Fibre/Simulations
- No updates from Alexey
- Has working simulation and now just doing checking of various positioning of detectors
- Put LICs along the beamline in simulation, will determine on how many we need
- Timeline for when the beamlines will be in place?
- Will beamlines be installed both at the same time? Probably?
- Need to have large benders from BL4N installed first
AOB
- Darklight got RTI around 400k
- And already have an NSERC
- Build a ring in the ehall to boost the energy
- On top of being committed to realize terraherzt
- And need protection system for the ring as well (for free! ;))
- Some old PhD thesis for design draft available and from ERL (Berlin)
- Fibre for the ring? As MPS option. Cherenkov based.