Line 23: Line 23:
*No installation before summer
*No installation before summer
*Need specs from Stephanie
*Need specs from Stephanie
*Need work request for the install, so likely needed since multiple groups will be involved
*
*


Line 31: Line 32:


==Fibre/Simulations==
==Fibre/Simulations==
*Any updates?
*No updates from Alexey
*Has working simulation and now just doing checking of various positioning of detectors
*Put LICs along the beamline in simulation, will determine on how many we need
*Timeline for when the beamlines will be in place?
*Will beamlines be installed both at the same time? Probably?
*Need to have large benders from BL4N installed first
*


==AOB==
==AOB==
*Darklight got RTI around 400k
*And already have an NSERC
*Build a ring in the ehall to boost the energy
*On top of being committed to realize terraherzt
*And need protection system for the ring as well (for free! ;))
*Some old PhD thesis for design draft available and from ERL (Berlin)
*Fibre for the ring? As MPS option. Cherenkov based.

Latest revision as of 17:27, 11 April 2024

Present: Commenced: 10:00am Adjourned:

MPS Status

  • Argon only turned on during force tests
  • Detectors in working order

BLM force tests

  • Straight forward so far
  • Prevention of second force
  • if applying second force, instead of rejecting it, it removes force from first detector and forces the other
  • EHAT:LIC1 (has 2 sets of redundancies)
  • EHAT:LIC2 ()
  • Done half of the BLMs without beam
  • And then do the beam tests
  • ELBT wouldn't include any force parts
  • April 22nd was the plan for beam back, but need to get egun oil
  • April 22nd shielding should be replaced that day
  • Collimator in the making (in one of the machine shops)
  • Designed by sci-tec
  • No installation before summer
  • Need specs from Stephanie
  • Need work request for the install, so likely needed since multiple groups will be involved

Collimator in front of dump

  • Has been installed by Doug
  • Next steps?
  • Do we have specs, to check if it can be implemented into our MPS system? ==> Stephanie

Fibre/Simulations

  • No updates from Alexey
  • Has working simulation and now just doing checking of various positioning of detectors
  • Put LICs along the beamline in simulation, will determine on how many we need
  • Timeline for when the beamlines will be in place?
  • Will beamlines be installed both at the same time? Probably?
  • Need to have large benders from BL4N installed first

AOB

  • Darklight got RTI around 400k
  • And already have an NSERC
  • Build a ring in the ehall to boost the energy
  • On top of being committed to realize terraherzt
  • And need protection system for the ring as well (for free! ;))
  • Some old PhD thesis for design draft available and from ERL (Berlin)
  • Fibre for the ring? As MPS option. Cherenkov based.