MPSMinutes 20210520: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
 (→Fibre)  | 
				|||
| Line 6: | Line 6: | ||
= Ehall work =  | = Ehall work =  | ||
*AL, MA finished re-routing high-energy cables and HH shortened and terminated cables on Tuesday, which took about 6hrs. Labels were attached  | |||
*AL to attach new labels on roof. Also for LEDs. AL to send HH list with required labels after meeting.  | |||
*MA, AL to finish Ar connections next Tuesday and get leak detector from Rick.  | |||
= Fibre =  | = Fibre =  | ||
Revision as of 17:05, 25 May 2021
Present: MA, HH, KL, MR, RN, RC, AD, AL (recorder)
Second stage trip
BLM HV trip (iseg)
Ehall work
- AL, MA finished re-routing high-energy cables and HH shortened and terminated cables on Tuesday, which took about 6hrs. Labels were attached
 - AL to attach new labels on roof. Also for LEDs. AL to send HH list with required labels after meeting.
 - MA, AL to finish Ar connections next Tuesday and get leak detector from Rick.
 
Fibre
- MA to do baseline tests next week
 
LED calibration
- AL to write sequence of operation as base for EPICS implementation.
 - Parallel ramp up of all LEDs with PMTs at voltage