Elog Entry 2021-05-25: Difference between revisions

From MPS Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
=LED labels=
*Changed labels on roof for all used high energy cables.
*Changed labels on roof for all used high energy cables.
*Changed LED label from EABD:PMT1:LED to EABD:PMT0:LED and move cable from LED CH6 to 4.
*Changed LED label from EABD:PMT1:LED to EABD:PMT0:LED and move cable from LED CH6 to 4.
Line 5: Line 6:
*Changed LED label from ELBD:PMT1:SIG (LED cable) to EHDT:PMT2:LED and connected to CH6.
*Changed LED label from ELBD:PMT1:SIG (LED cable) to EHDT:PMT2:LED and connected to CH6.
*Changed LED label from EHDT:PMT1:LED to EHDT:PMT4:LED and moved from channel 2 to 7.
*Changed LED label from EHDT:PMT1:LED to EHDT:PMT4:LED and moved from channel 2 to 7.
=Detector testing=
*EMBT:PMT3, 50V, ramps up, 0.05uA readback. Using LED driver channel 3 to check response. Works. ~300pC at 70%.
*

Revision as of 22:43, 25 May 2021

LED labels

  • Changed labels on roof for all used high energy cables.
  • Changed LED label from EABD:PMT1:LED to EABD:PMT0:LED and move cable from LED CH6 to 4.
  • Changed LED label from EMBT:PMT2:SIG (looks like SIG cable, but worked in the past) to EMBT:PMT3:LED. Moved cable from LED CH5 to 3.
  • Connected EHAT:PMT4:LED to CH5.
  • Changed LED label from ELBD:PMT1:SIG (LED cable) to EHDT:PMT2:LED and connected to CH6.
  • Changed LED label from EHDT:PMT1:LED to EHDT:PMT4:LED and moved from channel 2 to 7.

Detector testing

  • EMBT:PMT3, 50V, ramps up, 0.05uA readback. Using LED driver channel 3 to check response. Works. ~300pC at 70%.