MPS Minutes 20210708: Difference between revisions

From MPS Wiki
Jump to navigation Jump to search
(Created page with "== Firmware upgrade == == Post Mortem == == E-linac activities == == Fibre work == == AOB ==")
 
 
(One intermediate revision by the same user not shown)
Line 8: Line 8:


== AOB ==
== AOB ==
Truth table, etc.
Commissioning doc.
    Commissioning plan required for FSD and TBLM changes
        BH and MA to come up with commissioning plan for FSD
        KL will build large truth table to test FSD on bench
        RN will look for released doc which includes list of all I/O on FSD (can serve as starting point for comm. plan)

Latest revision as of 16:51, 8 July 2021

Firmware upgrade

Post Mortem

E-linac activities

Fibre work

AOB

Truth table, etc. Commissioning doc.

   Commissioning plan required for FSD and TBLM changes 
       BH and MA to come up with commissioning plan for FSD 
       KL will build large truth table to test FSD on bench 
       RN will look for released doc which includes list of all I/O on FSD (can serve as starting point for comm. plan)