MPS Minutes 20210708: Difference between revisions
Jump to navigation
Jump to search
(Created page with "== Firmware upgrade == == Post Mortem == == E-linac activities == == Fibre work == == AOB ==") |
(→AOB) |
||
(One intermediate revision by the same user not shown) | |||
Line 8: | Line 8: | ||
== AOB == | == AOB == | ||
Truth table, etc. | |||
Commissioning doc. | |||
Commissioning plan required for FSD and TBLM changes | |||
BH and MA to come up with commissioning plan for FSD | |||
KL will build large truth table to test FSD on bench | |||
RN will look for released doc which includes list of all I/O on FSD (can serve as starting point for comm. plan) |
Latest revision as of 16:51, 8 July 2021
Firmware upgrade
Post Mortem
E-linac activities
Fibre work
AOB
Truth table, etc. Commissioning doc.
Commissioning plan required for FSD and TBLM changes
BH and MA to come up with commissioning plan for FSD
KL will build large truth table to test FSD on bench
RN will look for released doc which includes list of all I/O on FSD (can serve as starting point for comm. plan)