MPS Minutes 20230302: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
 (Created page with "Present: BH, MA, RC, SR, MR, HH, RN, AL Commenced: 10:01am Adjourned: 10:30am  ==BLM force functionality== *Roll-out done by Mike this week. *First test performed with Brandon. Forced one detector, and it was still possible to send beam *")  | 
				No edit summary  | 
				||
| Line 6: | Line 6: | ||
*Roll-out done by Mike this week.  | *Roll-out done by Mike this week.  | ||
*First test performed with Brandon. Forced one detector, and it was still possible to send beam  | *First test performed with Brandon. Forced one detector, and it was still possible to send beam  | ||
*  | *First tests successful  | ||
*AL verified threshold and voltage settings are correct after roll-out  | |||
*For EMBD:LIC2 (on the detector page), the slider for HV is at zero, while the voltage seems on and the readback is at 500V. MR to look into this.  | |||
*Next step: Testing. AL to write up testing/commissioning procedure. This has priority.  | |||
==E-linac Status==  | |||
*Obtaining license will still take at least 6 weeks.  | |||
==BLM position==  | |||
*AL messaged Darren Blom to get remaining BLMs fixed in place  | |||
*Will pick a day when hall is open next week  | |||
*Darren suggested 3D printed option for mount of one of the low-energy detectors that was moved during work last year  | |||
*Even though darklight will be installed in high energy dump section, LICs should be fixed in place for now.  | |||
*Recommissioning will be required whenever changes to beamline are made  | |||
==Post Mortem==  | |||
*AL to do tests with RC next week to check functionality and readout  | |||
*Use LEDs and external trip for offline testing  | |||
==Fibre==  | |||
*No update  | |||
==BLM calibration==  | |||
*BLM calibration functionality will be implemented once BLM force functionality has been tested  | |||
*AL to finish document first  | |||
==AOB==  | |||
*ELBD:PMT0 detector should no longer cause a trip of the FSD, as it's not positioned along beamline anymore, but in front of egun window for monitoring  | |||
*MR to remove this detector from trip logic and detector ok check. Will require work permit and update of documentation  | |||
Latest revision as of 19:13, 2 March 2023
Present: BH, MA, RC, SR, MR, HH, RN, AL Commenced: 10:01am Adjourned: 10:30am
BLM force functionality
- Roll-out done by Mike this week.
 - First test performed with Brandon. Forced one detector, and it was still possible to send beam
 - First tests successful
 - AL verified threshold and voltage settings are correct after roll-out
 - For EMBD:LIC2 (on the detector page), the slider for HV is at zero, while the voltage seems on and the readback is at 500V. MR to look into this.
 - Next step: Testing. AL to write up testing/commissioning procedure. This has priority.
 
E-linac Status
- Obtaining license will still take at least 6 weeks.
 
BLM position
- AL messaged Darren Blom to get remaining BLMs fixed in place
 - Will pick a day when hall is open next week
 - Darren suggested 3D printed option for mount of one of the low-energy detectors that was moved during work last year
 - Even though darklight will be installed in high energy dump section, LICs should be fixed in place for now.
 - Recommissioning will be required whenever changes to beamline are made
 
Post Mortem
- AL to do tests with RC next week to check functionality and readout
 - Use LEDs and external trip for offline testing
 
Fibre
- No update
 
BLM calibration
- BLM calibration functionality will be implemented once BLM force functionality has been tested
 - AL to finish document first
 
AOB
- ELBD:PMT0 detector should no longer cause a trip of the FSD, as it's not positioned along beamline anymore, but in front of egun window for monitoring
 - MR to remove this detector from trip logic and detector ok check. Will require work permit and update of documentation