MPS Minutes 20240411: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
 (→AOB)  | 
				|||
| (6 intermediate revisions by the same user not shown) | |||
| Line 23: | Line 23: | ||
*No installation before summer  | *No installation before summer  | ||
*Need specs from Stephanie  | *Need specs from Stephanie  | ||
*Need work request for the install, so likely needed since multiple groups will be involved  | |||
*  | *  | ||
| Line 31: | Line 32: | ||
==Fibre/Simulations==  | ==Fibre/Simulations==  | ||
*  | *No updates from Alexey  | ||
*Has working simulation and now just doing checking of various positioning of detectors  | |||
*Put LICs along the beamline in simulation, will determine on how many we need  | |||
*Timeline for when the beamlines will be in place?  | |||
*Will beamlines be installed both at the same time? Probably?  | |||
*Need to have large benders from BL4N installed first  | |||
*  | |||
==AOB==  | ==AOB==  | ||
*Darklight got RTI around 400k  | |||
*And already have an NSERC  | |||
*Build a ring in the ehall to boost the energy  | |||
*On top of being committed to realize terraherzt  | |||
*And need protection system for the ring as well (for free! ;))  | |||
*Some old PhD thesis for design draft available and from ERL (Berlin)  | |||
*Fibre for the ring? As MPS option. Cherenkov based.  | |||
Latest revision as of 17:27, 11 April 2024
Present: Commenced: 10:00am Adjourned:
MPS Status
- Argon only turned on during force tests
 - Detectors in working order
 
BLM force tests
- Straight forward so far
 - Prevention of second force
 - if applying second force, instead of rejecting it, it removes force from first detector and forces the other
 - EHAT:LIC1 (has 2 sets of redundancies)
 - EHAT:LIC2 ()
 - Done half of the BLMs without beam
 - And then do the beam tests
 - ELBT wouldn't include any force parts
 - April 22nd was the plan for beam back, but need to get egun oil
 - April 22nd shielding should be replaced that day
 
- Collimator in the making (in one of the machine shops)
 - Designed by sci-tec
 - No installation before summer
 - Need specs from Stephanie
 - Need work request for the install, so likely needed since multiple groups will be involved
 
Collimator in front of dump
- Has been installed by Doug
 - Next steps?
 - Do we have specs, to check if it can be implemented into our MPS system? ==> Stephanie
 
Fibre/Simulations
- No updates from Alexey
 - Has working simulation and now just doing checking of various positioning of detectors
 - Put LICs along the beamline in simulation, will determine on how many we need
 - Timeline for when the beamlines will be in place?
 - Will beamlines be installed both at the same time? Probably?
 - Need to have large benders from BL4N installed first
 
AOB
- Darklight got RTI around 400k
 - And already have an NSERC
 - Build a ring in the ehall to boost the energy
 - On top of being committed to realize terraherzt
 - And need protection system for the ring as well (for free! ;))
 - Some old PhD thesis for design draft available and from ERL (Berlin)
 - Fibre for the ring? As MPS option. Cherenkov based.