MPS Minutes 20210527: Difference between revisions

From MPS Wiki
Jump to navigation Jump to search
(Created page with "Present: MA, RC, AD, HH, KL, RN, AL (recorder) ==Second stage trip == ==HV BLM issue (iseg) == == E-hall work == == Fibre == == AOB ==")
 
Line 10: Line 10:


== AOB ==
== AOB ==
*HH replaced broken HV connector on roof for ELBT:PMT1C.
*AD to correct LED label in epics on driver from EHBT:PMT4 to EHAT:PMT4.
*MA: Wiki now accessible without vpn connection. Should be ok, as documents are only linked and not uploaded. To access those one still has to use vpn.
*AL still needs to write up doc for LED calibration. For LICs, we'll probably just use regular spills (in between targets for instance) to test LIC response in the future.
*MA, AL to do Post-Mortem tests.
*AD approved Martin's document in docushare.

Revision as of 22:43, 27 May 2021

Present: MA, RC, AD, HH, KL, RN, AL (recorder)

Second stage trip

HV BLM issue (iseg)

E-hall work

Fibre

AOB

  • HH replaced broken HV connector on roof for ELBT:PMT1C.
  • AD to correct LED label in epics on driver from EHBT:PMT4 to EHAT:PMT4.
  • MA: Wiki now accessible without vpn connection. Should be ok, as documents are only linked and not uploaded. To access those one still has to use vpn.
  • AL still needs to write up doc for LED calibration. For LICs, we'll probably just use regular spills (in between targets for instance) to test LIC response in the future.
  • MA, AL to do Post-Mortem tests.
  • AD approved Martin's document in docushare.