MPS Minutes 20220120: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
 (Created page with "==FLASH/Darklight effect on MPS==  *Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and...")  | 
				No edit summary  | 
				||
| Line 1: | Line 1: | ||
==BLM calibration==  | |||
*AL preparing documents for requirements and specs  | |||
==View screen / BLM interlocks for tuning==  | |||
*AL preparing documents for requirements and specs  | |||
==FLASH/Darklight effect on MPS==  | ==FLASH/Darklight effect on MPS==  | ||
*Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications  | *Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications  | ||
*Recommissioning required for medium and high energy section.  | |||
==2nd stage trip implementation==  | |||
*Final status of implementation?  | |||
*What is left to do/needed?  | |||
==Fibre==  | |||
*Do we have PMT?  | |||
*What SiPMs are we looking to buy?  | |||
==AOB==  | |||
Revision as of 17:43, 20 January 2022
BLM calibration
- AL preparing documents for requirements and specs
 
View screen / BLM interlocks for tuning
- AL preparing documents for requirements and specs
 
FLASH/Darklight effect on MPS
- Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications
 - Recommissioning required for medium and high energy section.
 
2nd stage trip implementation
- Final status of implementation?
 - What is left to do/needed?
 
Fibre
- Do we have PMT?
 - What SiPMs are we looking to buy?