| Line 11: | Line 11: | ||
==FLASH/Darklight effect on MPS==  | ==FLASH/Darklight effect on MPS==  | ||
*Darklight and FLASH installation complete  | |||
*Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications  | *Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications  | ||
*Recommissioning required for medium and high energy section.  | *Recommissioning required for medium and high energy section.  | ||
*1kW for FLASH dump in pulse mode. 1W in continuous mode. There might be extra room for BLM thresholds ==> AL to follow up with Luca E.  | |||
*original dump design was for 500W ?  | |||
==2nd stage trip implementation==  | ==2nd stage trip implementation==  | ||
Revision as of 00:23, 21 January 2022
BLM calibration
- AL preparing documents for requirements and specs
 - Needs to be done at reasonable background levels, i.e., not with high dark current conditions from cavities.
 - Should this go hand in hand with scan to verify coverage after a long shut down period?
 - Add flow chart
 
View screen / BLM interlocks for tuning
- AL preparing documents for requirements and specs
 - Is table and requirements enough? Or what should document look like?
 
FLASH/Darklight effect on MPS
- Darklight and FLASH installation complete
 - Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications
 - Recommissioning required for medium and high energy section.
 - 1kW for FLASH dump in pulse mode. 1W in continuous mode. There might be extra room for BLM thresholds ==> AL to follow up with Luca E.
 - original dump design was for 500W ?
 
2nd stage trip implementation
- Final status of implementation?
 - What is left to do/needed?
 
Fibre
- Do we have PMT?
 - What SiPMs are we looking to buy?
 
AOB
- Do all channels already have an HV OK? Do some still need to be added to watchdog?
 - Making LICs for BL4N once cases are down a bit