MPS Minutes 20220120: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
No edit summary  | 
				|||
| Line 3: | Line 3: | ||
*Needs to be done at reasonable background levels, i.e., not with high dark current conditions from cavities.  | *Needs to be done at reasonable background levels, i.e., not with high dark current conditions from cavities.  | ||
*Should this go hand in hand with scan to verify coverage after a long shut down period?  | *Should this go hand in hand with scan to verify coverage after a long shut down period?  | ||
*Add flow chart  | *Add flow chart for sequence of events  | ||
*AL to implement comments for BLM calibration requirements/specs document and send out to reviewers  | |||
*Add requirements: For instance, beam needs to be off for calibration, cavities off => procedure during downtime  | |||
*Add Rod, Alex and Brandon as reviewer, Mike for final approval  | |||
*Make sure to define times precisely  | |||
*Use 2 calibration points for PMTs to verify linearity  | |||
==View screen / BLM interlocks for tuning==  | ==View screen / BLM interlocks for tuning==  | ||
*AL preparing documents for requirements and specs  | *AL preparing documents for requirements and specs  | ||
*  | *Add requirements and table  | ||
*6-7 VS with 1 or 2 BLMs to be prevented from tripping  | |||
*Be clear on definition of "disabled". Trip function should be disabled, but readback must be available.  | |||
==FLASH/Darklight effect on MPS==  | ==FLASH/Darklight effect on MPS==  | ||
| Line 16: | Line 23: | ||
*1kW for FLASH dump in pulse mode. 1W in continuous mode. There might be extra room for BLM thresholds ==> AL to follow up with Luca E.  | *1kW for FLASH dump in pulse mode. 1W in continuous mode. There might be extra room for BLM thresholds ==> AL to follow up with Luca E.  | ||
*original dump design was for 500W ?  | *original dump design was for 500W ?  | ||
==Fibre==  | ==Fibre==  | ||
*  | *MA in contact with Hamamatsu on lead times for PMTs. Seem to be around 2-3 months.  | ||
*  | *2 PMTs may be available from Conny  | ||
*Thomas Lindner took his PMT back end of 2021  | |||
*Thomas L. had factory/of-the-shelve fibre coupler. We may need 3D printed coupler and just buy connector. HH thinks this is possbile. Have 3D printer with black plastic available for use.  | |||
*MA will try to get drawings from manufacturer  | |||
==AOB==  | ==AOB==  | ||
*Making LICs for BL4N once cases are down a bit  | |||
*HH offers to be around when Phil L. shows AL and MA how to manufacturer LICs. Possible option to make the LICs in electronics shop.  | |||
*MA to check with Phil L. if all parts are available.   | |||
*Do we have enough for full length of tunnel?   | |||
*Might make longer LICs depending on required position resolution  | |||
*Tricky part might be the end caps to seal Argon connections.  | |||
==Action Items==  | |||
*AL to follow up with Luca E. on power levels for FLASH dump.  | |||
*AL to implement comments for BLM calibration requirements/specs document and send out to reviewers  | |||
*MA: What SiPMs and or PMTs are we looking to buy?  | |||
*Fibre coupler: MA will try to get drawings from manufacturer for 3D printing option  | |||
*2nd stage trip implementation:   | |||
**Final status of implementation?  | |||
**What is left to do/needed?  | |||
*Do all channels already have an HV OK? Do some still need to be added to watchdog?  | *Do all channels already have an HV OK? Do some still need to be added to watchdog?  | ||
Revision as of 00:34, 21 January 2022
BLM calibration
- AL preparing documents for requirements and specs
 - Needs to be done at reasonable background levels, i.e., not with high dark current conditions from cavities.
 - Should this go hand in hand with scan to verify coverage after a long shut down period?
 - Add flow chart for sequence of events
 - AL to implement comments for BLM calibration requirements/specs document and send out to reviewers
 - Add requirements: For instance, beam needs to be off for calibration, cavities off => procedure during downtime
 - Add Rod, Alex and Brandon as reviewer, Mike for final approval
 - Make sure to define times precisely
 - Use 2 calibration points for PMTs to verify linearity
 
View screen / BLM interlocks for tuning
- AL preparing documents for requirements and specs
 - Add requirements and table
 - 6-7 VS with 1 or 2 BLMs to be prevented from tripping
 - Be clear on definition of "disabled". Trip function should be disabled, but readback must be available.
 
FLASH/Darklight effect on MPS
- Darklight and FLASH installation complete
 - Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications
 - Recommissioning required for medium and high energy section.
 - 1kW for FLASH dump in pulse mode. 1W in continuous mode. There might be extra room for BLM thresholds ==> AL to follow up with Luca E.
 - original dump design was for 500W ?
 
Fibre
- MA in contact with Hamamatsu on lead times for PMTs. Seem to be around 2-3 months.
 - 2 PMTs may be available from Conny
 - Thomas Lindner took his PMT back end of 2021
 - Thomas L. had factory/of-the-shelve fibre coupler. We may need 3D printed coupler and just buy connector. HH thinks this is possbile. Have 3D printer with black plastic available for use.
 - MA will try to get drawings from manufacturer
 
AOB
- Making LICs for BL4N once cases are down a bit
 - HH offers to be around when Phil L. shows AL and MA how to manufacturer LICs. Possible option to make the LICs in electronics shop.
 - MA to check with Phil L. if all parts are available.
 - Do we have enough for full length of tunnel?
 - Might make longer LICs depending on required position resolution
 - Tricky part might be the end caps to seal Argon connections.
 
Action Items
- AL to follow up with Luca E. on power levels for FLASH dump.
 - AL to implement comments for BLM calibration requirements/specs document and send out to reviewers
 - MA: What SiPMs and or PMTs are we looking to buy?
 - Fibre coupler: MA will try to get drawings from manufacturer for 3D printing option
 - 2nd stage trip implementation:
- Final status of implementation?
 - What is left to do/needed?
 
 - Do all channels already have an HV OK? Do some still need to be added to watchdog?