MPS Minutes 20220616: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
No edit summary  | 
				|||
| Line 7: | Line 7: | ||
===MPS status===  | ===MPS status===  | ||
*LIC0 trouble shooting  | *LIC0 trouble shooting  | ||
**EMBD:LIC0 indicated red on "installed" status. Maybe module wasn't seated properly?  | |||
*Argon flow started yesterday  | *Argon flow started yesterday  | ||
*Keiko updated signal PV in the alarm handler and archiver for former ELBT:PMT1A now ELBT:LICSP1 (spare channel)  | *Keiko updated signal PV in the alarm handler and archiver for former ELBT:PMT1A now ELBT:LICSP1 (spare channel)  | ||
===S1 to S2 delay===  | ===S1 to S2 delay===  | ||
Revision as of 16:48, 16 June 2022
MPS meeting minutes – June 16th – 2022
Present: Meeting commenced: 10am PT Meeting adjourned:
MPS status
- LIC0 trouble shooting
- EMBD:LIC0 indicated red on "installed" status. Maybe module wasn't seated properly?
 
 - Argon flow started yesterday
 - Keiko updated signal PV in the alarm handler and archiver for former ELBT:PMT1A now ELBT:LICSP1 (spare channel)
 
S1 to S2 delay
- the delay between stage 1 trip detection to stage 2
 - detect mode was fixed at 10us (plus some inherent delay through the FSD and timing system ~5us).
 - Delay is adjustable between 1us and 25us. Default is 10us.
 - EPICS indications for S1/S2 trips => Ricky to check what is indicated when at the moment and potentially adjust to avoid confusion
 
FLASH
- anything since last week’s email?
 - Board modifications complete
 - Still need to update epics conversion factors
 - HH thinks the modified board will work for FLASH. Before I it can be install, Controls will need to change the conversion factors on
 
the EPICS screen. Basically all existing conversion need to be increased by 100.
- Rod to let HH know who will be make the changes and HH will email the “updated” user manual.
 
E-Linac status
=> Brandon
AOB
- The beam path restrictions are not really set up to make sure BLMs are running. Only checking HV for low-energy section
 - Can we implement this now for the medium and high-energy sections? Would this cause issues, when temporarily disabling detectors?