MPS Minutes 20240411: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
No edit summary  | 
				|||
| Line 8: | Line 8: | ||
==BLM force tests==  | ==BLM force tests==  | ||
*Straight forward so far  | |||
*Prevention of second force  | |||
*if applying second force, instead of rejecting it, it removes force from first detector and forces the other  | |||
*EHAT:LIC1 (has 2 sets of redundancies)  | |||
*EHAT:LIC2 ()  | |||
*Done half of the BLMs without beam  | |||
*And then do the beam tests  | |||
*ELBT wouldn't include any force parts  | |||
*April 22nd was the plan for beam back, but need to get egun oil  | |||
*April 22nd shielding should be replaced that day  | |||
*Collimator in the making (in one of the machine shops)  | |||
*Designed by sci-tec  | |||
*No installation before summer  | |||
*Need specs from Stephanie  | |||
*  | |||
==Collimator in front of dump==  | ==Collimator in front of dump==  | ||
Revision as of 17:10, 11 April 2024
Present: Commenced: 10:00am Adjourned:
MPS Status
- Argon only turned on during force tests
 - Detectors in working order
 
BLM force tests
- Straight forward so far
 - Prevention of second force
 - if applying second force, instead of rejecting it, it removes force from first detector and forces the other
 - EHAT:LIC1 (has 2 sets of redundancies)
 - EHAT:LIC2 ()
 - Done half of the BLMs without beam
 - And then do the beam tests
 - ELBT wouldn't include any force parts
 - April 22nd was the plan for beam back, but need to get egun oil
 - April 22nd shielding should be replaced that day
 
- Collimator in the making (in one of the machine shops)
 - Designed by sci-tec
 - No installation before summer
 - Need specs from Stephanie
 
Collimator in front of dump
- Has been installed by Doug
 - Next steps?
 - Do we have specs, to check if it can be implemented into our MPS system? ==> Stephanie
 
Fibre/Simulations
- Any updates?