MPSMinutes 20210520: Difference between revisions
Jump to navigation
Jump to search
(Created page with "Present: MA, HH, KL, MR, RN, RC, AD, AL (recorder) = Second stage trip = = BLM HV trip (iseg) = = Ehall work = = Fibre = = LED calibration = *AL to write sequence of oper...") |
(→Fibre) |
||
Line 8: | Line 8: | ||
= Fibre = | = Fibre = | ||
*MA to do baseline tests next week | |||
= LED calibration = | = LED calibration = |
Revision as of 17:02, 25 May 2021
Present: MA, HH, KL, MR, RN, RC, AD, AL (recorder)
Second stage trip
BLM HV trip (iseg)
Ehall work
Fibre
- MA to do baseline tests next week
LED calibration
- AL to write sequence of operation as base for EPICS implementation.
- Parallel ramp up of all LEDs with PMTs at voltage