MPS Minutes 20210527: Difference between revisions

From MPS Wiki
Jump to navigation Jump to search
No edit summary
Line 30: Line 30:
*MA, AL to do Post-Mortem tests.
*MA, AL to do Post-Mortem tests.
*AD approved Martin's document in docushare.
*AD approved Martin's document in docushare.
==Action Items ==
*AD to set address via IOC shell tomorrow (Friday). Work permit required.
*MA, AL to do Post-Mortem tests.
*AL to write up doc for LED calibration.
*MA to test PMT for fibre
*MA, AL to install low energy MPS detectors and spare.
*HH to continue on second stage trip and update documents.
*MA to check with Doug on cable floor protective covers

Revision as of 22:53, 27 May 2021

Present: MA, RC, AD, HH, KL, RN, AL (recorder)

Second stage trip

HV BLM issue (iseg)

  • HH had a look at the spares storage rack and did not find a single slot HV PS, but only a couple 2 slot units.
  • There is a metal cover over the entire board. It looks like iseg did not want a users to open it up just to change the module address.
  • There seems to be no manual way to set the address.
  • AD to set address via IOC shell tomorrow (Friday). Work permit required.
  • Exchange first and second module to see if trip issue moves for next Post Mortem tests.

E-hall work

  • AL, MA connected all detectors in e-hall on Tuesday and tested all PMTs with LEDs except EHAT:PMT4, which had an SHV connector on LED cable in the hall instead of BNC. But label was correct. HH to replace connector after meeting.
  • Also tested all LICs by ramping up voltage and checking response.
  • AL changed all high energy labels on the roof and reconnected things.
  • MA reconnected all Ar lines. Now have sufficient flow rate. But turned off Ar for now until we expect beam.
  • Helmholz coil was installed this morning. AL, MA to install low energy detectors today. And install spare detector for diagnostics as requested by Brandon.
  • After low energy detectors are installed, work in e-hall should be finished for the moment.

Fibre

  • No update
  • MA to test PMT
  • Might use empty channel on module 1

AOB

  • HH replaced broken HV connector on roof for ELBT:PMT1C.
  • AD to correct LED label in epics on driver from EHBT:PMT4 to EHAT:PMT4.
  • MA: Wiki now accessible without vpn connection. Should be ok, as documents are only linked and not uploaded. To access those one still has to use vpn.
  • AL still needs to write up doc for LED calibration. For LICs, we'll probably just use regular spills (in between targets for instance) to test LIC response in the future.
  • MA, AL to do Post-Mortem tests.
  • AD approved Martin's document in docushare.

Action Items

  • AD to set address via IOC shell tomorrow (Friday). Work permit required.
  • MA, AL to do Post-Mortem tests.
  • AL to write up doc for LED calibration.
  • MA to test PMT for fibre
  • MA, AL to install low energy MPS detectors and spare.
  • HH to continue on second stage trip and update documents.
  • MA to check with Doug on cable floor protective covers