MPS Minutes 20210527: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 6: | Line 6: | ||
*HH fixed issue with pulses - > Test with Ricky's crate on Monday.  | *HH fixed issue with pulses - > Test with Ricky's crate on Monday.  | ||
*For trip we no longer rely on timing system, but module will handle it itself and trip on the falling edge.  | *For trip we no longer rely on timing system, but module will handle it itself and trip on the falling edge.  | ||
*  | *HH generating an additional 5us to existing 5us => 10us  | ||
*There's requirement for pulses to be no wider than 1us, but we should be good as timing system generates 900ns pulse. HH to confirm with MR.  | |||
*HH added two more status bits.  | |||
==HV BLM issue (iseg) ==  | ==HV BLM issue (iseg) ==  | ||
Revision as of 23:05, 27 May 2021
Present: MA, RC, AD, HH, KL, RN, AL (recorder)
Second stage trip
- HH had issues with VME bridge module
 - Timings have to be very precise, otherwise one runs into issues with module. But CAEN documentation is really poor.
 - HH fixed issue with pulses - > Test with Ricky's crate on Monday.
 - For trip we no longer rely on timing system, but module will handle it itself and trip on the falling edge.
 - HH generating an additional 5us to existing 5us => 10us
 - There's requirement for pulses to be no wider than 1us, but we should be good as timing system generates 900ns pulse. HH to confirm with MR.
 - HH added two more status bits.
 
HV BLM issue (iseg)
- HH had a look at the spares storage rack and did not find a single slot HV PS, but only a couple 2 slot units.
 - There is a metal cover over the entire board. It looks like iseg did not want a users to open it up just to change the module address.
 - There seems to be no manual way to set the address.
 - AD to set address via IOC shell tomorrow (Friday). Work permit required.
 - Exchange first and second module to see if trip issue moves for next Post Mortem tests.
 
E-hall work
- AL, MA connected all detectors in e-hall on Tuesday and tested all PMTs with LEDs except EHAT:PMT4, which had an SHV connector on LED cable in the hall instead of BNC. But label was correct. HH to replace connector after meeting.
 - Also tested all LICs by ramping up voltage and checking response.
 - AL changed all high energy labels on the roof and reconnected things.
 - MA reconnected all Ar lines. Now have sufficient flow rate. But turned off Ar for now until we expect beam.
 - Helmholz coil was installed this morning. AL, MA to install low energy detectors today. And install spare detector for diagnostics as requested by Brandon.
 - After low energy detectors are installed, work in e-hall should be finished for the moment.
 
Fibre
- No update
 - MA to test PMT
 - Might use empty channel on module 1
 
AOB
- HH replaced broken HV connector on roof for ELBT:PMT1C.
 - AD to correct LED label in epics on driver from EHBT:PMT4 to EHAT:PMT4.
 - MA: Wiki now accessible without vpn connection. Should be ok, as documents are only linked and not uploaded. To access those one still has to use vpn.
 - AL still needs to write up doc for LED calibration. For LICs, we'll probably just use regular spills (in between targets for instance) to test LIC response in the future.
 - MA, AL to do Post-Mortem tests.
 - AD approved Martin's document in docushare.
 
Action Items
- AD to set address via IOC shell tomorrow (Friday). Work permit required.
 - MA, AL to do Post-Mortem tests.
 - AL to write up doc for LED calibration.
 - MA to test PMT for fibre
 - MA, AL to install low energy MPS detectors and spare.
 - HH to continue on second stage trip and update documents.
 - MA to check with Doug on cable floor protective covers