*AL preparing documents for requirements and specs  | *AL preparing documents for requirements and specs  | ||
*Is table and requirements enough? Or what should document look like?  | |||
==FLASH/Darklight effect on MPS==  | ==FLASH/Darklight effect on MPS==  | ||
Revision as of 17:44, 20 January 2022
BLM calibration
- AL preparing documents for requirements and specs
 
View screen / BLM interlocks for tuning
- AL preparing documents for requirements and specs
 - Is table and requirements enough? Or what should document look like?
 
FLASH/Darklight effect on MPS
- Email from Luca Egoriti last week: hoping to put beam on the FLASH station (the old EMBD dump) as soon as the e-linac is back in shape, and since the shielding envelope has changed we foresee higher dose rates in the ehall coming from the target/dump. Hence, we wanted to let you know since there might be some MPS work to be done to accommodate the modifications
 - Recommissioning required for medium and high energy section.
 
2nd stage trip implementation
- Final status of implementation?
 - What is left to do/needed?
 
Fibre
- Do we have PMT?
 - What SiPMs are we looking to buy?