MPS Minutes 20240411: Difference between revisions
Jump to navigation
Jump to search
Line 23: | Line 23: | ||
*No installation before summer | *No installation before summer | ||
*Need specs from Stephanie | *Need specs from Stephanie | ||
*Need work request for the install, so likely needed since multiple groups will be involved | |||
* | * | ||
Revision as of 17:12, 11 April 2024
Present: Commenced: 10:00am Adjourned:
MPS Status
- Argon only turned on during force tests
- Detectors in working order
BLM force tests
- Straight forward so far
- Prevention of second force
- if applying second force, instead of rejecting it, it removes force from first detector and forces the other
- EHAT:LIC1 (has 2 sets of redundancies)
- EHAT:LIC2 ()
- Done half of the BLMs without beam
- And then do the beam tests
- ELBT wouldn't include any force parts
- April 22nd was the plan for beam back, but need to get egun oil
- April 22nd shielding should be replaced that day
- Collimator in the making (in one of the machine shops)
- Designed by sci-tec
- No installation before summer
- Need specs from Stephanie
- Need work request for the install, so likely needed since multiple groups will be involved
Collimator in front of dump
- Has been installed by Doug
- Next steps?
- Do we have specs, to check if it can be implemented into our MPS system? ==> Stephanie
Fibre/Simulations
- Any updates?