MPS Minutes 20240411: Difference between revisions
Jump to navigation
Jump to search
Line 33: | Line 33: | ||
==Fibre/Simulations== | ==Fibre/Simulations== | ||
*No updates from Alexey | *No updates from Alexey | ||
*Has working simulation and now just doing checking of various positioning of detectors | |||
*Put LICs along the beamline in simulation, will determine on how many we need | |||
*Timeline for when the beamlines will be in place? | |||
*Will beamlines be installed both at the same time? Probably? | |||
*Need to have large benders from BL4N installed first | |||
* | |||
==AOB== | ==AOB== |
Revision as of 17:17, 11 April 2024
Present: Commenced: 10:00am Adjourned:
MPS Status
- Argon only turned on during force tests
- Detectors in working order
BLM force tests
- Straight forward so far
- Prevention of second force
- if applying second force, instead of rejecting it, it removes force from first detector and forces the other
- EHAT:LIC1 (has 2 sets of redundancies)
- EHAT:LIC2 ()
- Done half of the BLMs without beam
- And then do the beam tests
- ELBT wouldn't include any force parts
- April 22nd was the plan for beam back, but need to get egun oil
- April 22nd shielding should be replaced that day
- Collimator in the making (in one of the machine shops)
- Designed by sci-tec
- No installation before summer
- Need specs from Stephanie
- Need work request for the install, so likely needed since multiple groups will be involved
Collimator in front of dump
- Has been installed by Doug
- Next steps?
- Do we have specs, to check if it can be implemented into our MPS system? ==> Stephanie
Fibre/Simulations
- No updates from Alexey
- Has working simulation and now just doing checking of various positioning of detectors
- Put LICs along the beamline in simulation, will determine on how many we need
- Timeline for when the beamlines will be in place?
- Will beamlines be installed both at the same time? Probably?
- Need to have large benders from BL4N installed first