MPSMinutes 20210520: Difference between revisions

From MPS Wiki
Jump to navigation Jump to search
(Created page with "Present: MA, HH, KL, MR, RN, RC, AD, AL (recorder) = Second stage trip = = BLM HV trip (iseg) = = Ehall work = = Fibre = = LED calibration = *AL to write sequence of oper...")
 
Line 8: Line 8:


= Fibre =
= Fibre =
*MA to do baseline tests next week


= LED calibration =
= LED calibration =

Revision as of 17:02, 25 May 2021

Present: MA, HH, KL, MR, RN, RC, AD, AL (recorder)

Second stage trip

BLM HV trip (iseg)

Ehall work

Fibre

  • MA to do baseline tests next week

LED calibration

  • AL to write sequence of operation as base for EPICS implementation.
  • Parallel ramp up of all LEDs with PMTs at voltage

AOB