MPSMinutes 20210520: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
 (Created page with "Present: MA, HH, KL, MR, RN, RC, AD, AL (recorder)  = Second stage trip =  = BLM HV trip (iseg) =  = Ehall work =  = Fibre =  = LED calibration = *AL to write sequence of oper...")  | 
				 (→Fibre)  | 
				||
| Line 8: | Line 8: | ||
= Fibre =  | = Fibre =  | ||
*MA to do baseline tests next week  | |||
= LED calibration =  | = LED calibration =  | ||
Revision as of 17:02, 25 May 2021
Present: MA, HH, KL, MR, RN, RC, AD, AL (recorder)
Second stage trip
BLM HV trip (iseg)
Ehall work
Fibre
- MA to do baseline tests next week
 
LED calibration
- AL to write sequence of operation as base for EPICS implementation.
 - Parallel ramp up of all LEDs with PMTs at voltage