MPSMinutes 20210520

From MPS Wiki
Jump to navigation Jump to search

Present: MA, HH, KL, MR, RN, RC, AD, AL (recorder)

Second stage trip

BLM HV trip (iseg)

Ehall work

Fibre

  • MA to do baseline tests next week

LED calibration

  • AL to write sequence of operation as base for EPICS implementation.
  • Parallel ramp up of all LEDs with PMTs at voltage

AOB