MPSMinutes 20210520
		
		
		
		Jump to navigation
		Jump to search
		
Present: MA, HH, KL, MR, RN, RC, AD, AL (recorder)
Second stage trip
BLM HV trip (iseg)
Ehall work
Fibre
LED calibration
- AL to write sequence of operation as base for EPICS implementation.
 - Parallel ramp up of all LEDs with PMTs at voltage