MPSMinutes 20210520
Jump to navigation
Jump to search
Present: MA, HH, KL, MR, RN, RC, AD, AL (recorder)
Second stage trip
BLM HV trip (iseg)
Ehall work
Fibre
- MA to do baseline tests next week
LED calibration
- AL to write sequence of operation as base for EPICS implementation.
- Parallel ramp up of all LEDs with PMTs at voltage