Elog Entry 2021-06-03: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
No edit summary  | 
				No edit summary  | 
				||
| Line 9: | Line 9: | ||
*Cannot reset HV for any of the detectors  | *Cannot reset HV for any of the detectors  | ||
*Walked Eric through power cycling MPS crate after the meeting  | |||
*Was able to restore voltages for all PMTs and modules and enable all detectors  | |||
[[File:ELBTPMT1B_PSfail.png|500px|PS fail]]  | [[File:ELBTPMT1B_PSfail.png|500px|PS fail]]  | ||
Latest revision as of 20:34, 3 June 2021
- Doing Post-Mortem tests after final changes have been implemented by Ricky
 - This is after address change of modules was performed
 - Starting 9:07 am
 - Using CH2 on Module 1 first (ELBT:PMT1B)
 - Enabling stop mode
 - Tripped detector via LED at 250pC
 - Then Hit diagnostics button and then saw power supply failed
 - All HVs for all three modules tripped
 - Cannot reset HV for any of the detectors
 
- Walked Eric through power cycling MPS crate after the meeting
 - Was able to restore voltages for all PMTs and modules and enable all detectors
 
