MPS Minutes 20210902: Difference between revisions
Jump to navigation
Jump to search
(Created page with "== Dark current scans == *Performed dark current scans in medium energy section this week with MB5A/C and MB0 *EINJ was at setpoint 900 ~9.5 MeV *EMBT:PMT3 was mostly at 55pC,...") |
(No difference)
|
Latest revision as of 22:30, 22 September 2021
Dark current scans
- Performed dark current scans in medium energy section this week with MB5A/C and MB0
- EINJ was at setpoint 900 ~9.5 MeV
- EMBT:PMT3 was mostly at 55pC, but went up to 70pC with a few spikes, otherwise constant level.
- Stephi said, the magnet settings were spikes occurred are unlikely tunes.
- EPICS connection from home was slow for Stephi, which was an issue for ramping magnet current
- Emphasized need for automated ramping program. Operator should step size and limit.
E-Linac Status
- E-Linac was down last week --> No beam
- Wednesday morning, Stephi and Ops had issues with the 2 low-energy PMTs tripping, while beam was supposed to be on EHD.