Line 37: Line 37:
|E-Linac goes to 1-3 kW
|E-Linac goes to 1-3 kW
|-
|-
|2021-08-25
|2022-06-16
|Annika
|Annika
|[[Elog Entry_2021-08-25 | ElogEntry]]
|[[Elog Entry_2022-06-16 | ElogEntry]]
|xxx
|xxx
|}
|}

Revision as of 20:16, 16 June 2022

Logbook
Date Author Entry Title
2021-05-25 Annika ElogEntry LED labeling and detector testing
2021-05-27 Annika ElogEntry Low energy detector installation and detector testing
2021-06-03 Annika ElogEntry Post-Mortem test
2021-06-04 Annika ElogEntry HV LED trip trouble shooting
2021-07-22 Annika ElogEntry MPS re-commissioning low energy 2021
2021-08-16 Annika ElogEntry E-Linac goes to 1-3 kW
2022-06-16 Annika ElogEntry xxx