Elog Entry 2021-06-03: Difference between revisions
Jump to navigation
Jump to search
(Created page with "*Doing Post-Mortem tests after final changes have been implemented by Ricky *This is after address change of modules was performed *Starting 9:07 am *Using CH2 on Module 1 fir...") |
No edit summary |
||
Line 8: | Line 8: | ||
*All HVs for all three modules tripped | *All HVs for all three modules tripped | ||
*Cannot reset HV for any of the detectors | *Cannot reset HV for any of the detectors | ||
[[File:ELBTPMT1B_PSfail.png|500px|PS fail]] | |||
[[File:BLM_HV_trip_allmodules.png|500px|HV trip]] |
Revision as of 16:32, 3 June 2021
- Doing Post-Mortem tests after final changes have been implemented by Ricky
- This is after address change of modules was performed
- Starting 9:07 am
- Using CH2 on Module 1 first (ELBT:PMT1B)
- Enabling stop mode
- Tripped detector via LED at 250pC
- Then Hit diagnostics button and then saw power supply failed
- All HVs for all three modules tripped
- Cannot reset HV for any of the detectors