Logbook: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
No edit summary  | 
				No edit summary  | 
				||
| Line 31: | Line 31: | ||
|[[Elog Entry_2021-07-22 | ElogEntry]]  | |[[Elog Entry_2021-07-22 | ElogEntry]]  | ||
|MPS re-commissioning low energy 2021  | |MPS re-commissioning low energy 2021  | ||
|-  | |||
|2021-08-16  | |||
|Annika  | |||
|[[Elog Entry_2021-08-16 | ElogEntry]]  | |||
|E-Linac goes to 1-3 kW  | |||
|}  | |}  | ||
Revision as of 23:26, 16 August 2021
| Logbook | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Date | Author | Entry | Title | |||||||
| 2021-05-25 | Annika | ElogEntry | LED labeling and detector testing | |||||||
| 2021-05-27 | Annika | ElogEntry | Low energy detector installation and detector testing | |||||||
| 2021-06-03 | Annika | ElogEntry | Post-Mortem test | |||||||
| 2021-06-04 | Annika | ElogEntry | HV LED trip trouble shooting | |||||||
| 2021-07-22 | Annika | ElogEntry | MPS re-commissioning low energy 2021 | |||||||
| 2021-08-16 | Annika | ElogEntry | E-Linac goes to 1-3 kW | |||||||