Elog Entry 2021-06-03
		
		
		
		Jump to navigation
		Jump to search
		
- Doing Post-Mortem tests after final changes have been implemented by Ricky
 - This is after address change of modules was performed
 - Starting 9:07 am
 - Using CH2 on Module 1 first (ELBT:PMT1B)
 - Enabling stop mode
 - Tripped detector via LED at 250pC
 - Then Hit diagnostics button and then saw power supply failed
 - All HVs for all three modules tripped
 - Cannot reset HV for any of the detectors
 
- Walked Eric through power cycling MPS crate after the meeting
 - Was able to restore voltages for all PMTs and modules and enable all detectors
 
