Elog Entry 2021-06-03

From MPS Wiki
Revision as of 16:29, 3 June 2021 by Lennarz (talk | contribs) (Created page with "*Doing Post-Mortem tests after final changes have been implemented by Ricky *This is after address change of modules was performed *Starting 9:07 am *Using CH2 on Module 1 fir...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
  • Doing Post-Mortem tests after final changes have been implemented by Ricky
  • This is after address change of modules was performed
  • Starting 9:07 am
  • Using CH2 on Module 1 first (ELBT:PMT1B)
  • Enabling stop mode
  • Tripped detector via LED at 250pC
  • Then Hit diagnostics button and then saw power supply failed
  • All HVs for all three modules tripped
  • Cannot reset HV for any of the detectors